Gold Coast Stadium Redevelopment - Carrara
The Gold Coast Stadium Redevelopment - Carrara will deliver a new 25,000 capacity oval stadium and provide the region with a home for the GCFC AFL team.
The venue will have the facilities needed to attract other sporting, entertainment and cultural events to the region such as cricket and athletics.
Click here to fly through the venue.
The stadium is a feature of the Gold Coast's bid to host the 2018 Commonwealth Games.
The stadium has been designed by Populous and will be constructed by Queensland construction firm, Watpac.
AFL mode
About the Gold Coast Stadium
Construction to involve an estimated
A large amount of materials from the old site is being recycled including
The Gold Coast Stadium Redevelopment - Carrara will deliver a new 25,000 capacity oval stadium and provide the region with a home for the GCFC AFL team.
The venue will have the facilities needed to attract other sporting, entertainment and cultural events to the region such as cricket and athletics.
Click here to fly through the venue.
The stadium is a feature of the Gold Coast's bid to host the 2018 Commonwealth Games.
The stadium has been designed by Populous and will be constructed by Queensland construction firm, Watpac.

AFL mode
- Home ground for the Gold Coast FC AFL team
- Capable of hosting cricket, entertainment and cultural events
- Field of Play 171 x 144m
- 25,000 capacity
- 2,000 corporate seats with a range of corporate facilities, including: Chairman’s lounge, Field Club, Club Lounge, Corporate suites, BBQ Decks
- Large HD Video board
- Merchandising outlets and catering facilities
- Media, player and officials facilities
Construction to involve an estimated
- 1,400 tonnes of structural steel
- 7,000 cubic metres of concrete
- 500 tonnes of reinforcement
- 5,600 metres of precast concrete seating plats
- 9,600 square metres of fabric roof
- 92,000 square metres of plaza works
- 600 m (10,000 square metres) of external roadworks
A large amount of materials from the old site is being recycled including
- More than 2,680m³ of concrete
- 350 tonnes of scrap steel
- 250 kilograms of copper
- 13 tonnes of aluminium
- 5.65 tonnes of plastic





